My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance No. 20513
COE
>
City of Eugene
>
Ordinances
>
2013 No. 20504 - 20519
>
Ordinance No. 20513
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2013 11:57:21 AM
Creation date
7/11/2013 11:04:04 AM
Metadata
Fields
Template:
Council Ordinances
CMO_Document_Number
20513
Document_Title
EWEB Master Plan
Adopted_Date
7/9/2013
Approved Date
7/9/2013
CMO_Effective_Date
8/9/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
501
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Eugene Water & Electric Board (EWEB) Master Planned Development <br />Transportation Planning Rule (TPR) Analysis <br />October 2012 <br />(A) Types or levels of travel or access that are inconsistent with the functional <br />classification of an existing or planned transportation facility, <br />(B) Degrade the performance of an existing or planned transportation facility such that it <br />would not meet the performance standards identified in the TSP or comprehensive plan; or <br />(C) Degrade the performance of an existing or planned transportation facility that is <br />otherwise projected to not meet the performance standards identified in the TSP or <br />comprehensive plan. <br />Response: The transportation impacts of the proposed zoning map amendments will have a reduced <br />peak hour impact to the site access and local transportation system compared to development under <br />the existing zoning. As such, the proposed zone change does not have a significant impact for TPR <br />purposes. The functional classifications of roadways in the study area are also unaffected by the <br />proposed zone change. <br />(4) Determinations under sections (1) -(3) of this rule shall be coordinated with affected transportation <br />facility and service providers and other affected local governments. <br />Response: The project team is coordinating the assessment of the transportation impacts with the City <br />of Eugene. <br />J FZA Kittelson & Associates, Inc. 30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.