My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance No. 20513
COE
>
City of Eugene
>
Ordinances
>
2013 No. 20504 - 20519
>
Ordinance No. 20513
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2013 11:57:21 AM
Creation date
7/11/2013 11:04:04 AM
Metadata
Fields
Template:
Council Ordinances
CMO_Document_Number
20513
Document_Title
EWEB Master Plan
Adopted_Date
7/9/2013
Approved Date
7/9/2013
CMO_Effective_Date
8/9/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
501
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Eugene Water & Electric Board (EWEB) Master Planned Development October 2012 <br />Traffic Impact Analysis <br />Railroad Crossing Relocation <br />The analysis presented in this report assumes reconstruction of the 8 1 h Avenue /Hilyard Street <br />intersection in conjunction with site development as envisioned by the City of Eugene. EWEB will work <br />with the City to procure funding for the improvement and subsequent development phases will <br />determine the appropriate year of completion. It is expected that a variety of public and private funding <br />sources may be used to fund the improvement given its benefits to both the EWEB site and the greater <br />subarea. <br />The EWEB Master Plan accommodates relocating the existing at -grade railroad crossing situated <br />between Broadway and 8th Avenue approximately 250 feet northwest to create a fourth leg to the <br />reconfigured 8th Avenue /Hilyard Street intersection. The relocation will allow for several <br />enhancements including: <br />The grade crossing relocation will align with the existing 8th Avenue, allowing for signalized <br />movements to and from the existing 8 1 h Avenue intersection; <br />■ The new traffic signal will accommodate full pedestrian movements (in addition to <br />improvements at the intersection, the new crossing will require upgrading the current <br />railroad track detection to provide adequate pedestrian clearance time prior to train <br />arrivals which in turn is expected to trigger detection changes to the north at High Street); <br />and <br />Provision of a northbound right -turn lane that will offer storage for right -turn vehicles <br />queued on Hilyard Street during train passage <br />A conceptual illustration of the reconfigured intersection is shown in Appendix H. <br />7 During train passage events when the railroad crossing is blocked, motorists will have the option of stopping at <br />the crossing and waiting for the train to clear or continuing north on Hilyard Street and accessing the EWEB site <br />via other routes, including Coburg Road. The variability in train arrival times, train length, the timing of a <br />motorist's arrival at the crossing, and other factors make it difficult to predict how many motorists will queue and <br />wait to turn right while a train passes through. The conceptual right -turn lane design shown on Hilyard Street can <br />readily accommodate seven passenger cars and can be constructed within the existing right -of -way, maximizing <br />the storage provided in the context of the intersection location and right -if -way available to the project. <br />J FZA Kittelson & Associates, Inc. 39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.