My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item B - Fire/EMS Stds of Cover
COE
>
City of Eugene
>
Council Agendas 2005
>
CC Agenda - 01/26/05 WS
>
Item B - Fire/EMS Stds of Cover
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 1:11:22 PM
Creation date
1/19/2005 11:01:53 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
1/26/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section Nine: Response Reliability <br /> <br />has decreased reliability overall. Thus the reassignment of the Valley River engine to the Santa <br />Clara Station is a system-wide concern rather than only a localized one. <br /> <br />While the response reliability figures above support the need to re-staff the Valley River engine, <br />they are not an entirely accurate measurement of the overall reliability of the system. This is true <br />not only because the system includes dynamically deployed response resources, but also because <br />units responding outside their normal first-response area are covering for units temporarily <br />assigned elsewhere (training, etc.). Actual response times are a far superior measure of the <br />effectiveness of the entire system. <br /> <br />The primary purpose of measuring response reliability is to show where call volume is <br />significant enough to indicate a need for a greater concentration of resources or possibly the need <br />for a peak activity unit. <br /> <br /> 73 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.