Laserfiche WebLink
<br />the stormwater SDC related to the 2,000 square feet of added impervious area. Using current SDC <br />rates of $0.165 per square foot, this development would normally be charged $330.00 stormwater <br />SDC but would qualify for a 10% or $33.00 reduction, resulting in a net SDC of $297.00. <br />2) Those sites where a portion of the site impervious area is subject to the standards for stormwater <br />pollution reduction but treat runoff from 20% or more impervious area than the minimum required <br />may also qualify. An example of this qualifying development type is a commercial development <br />constructing a building addition. The example development is adding more impervious area than the <br />minimum threshold which triggers stormwater quality development standards, e.g. 10,000 square feet, <br />but chooses to construct an approved water qualify feature which treats runoff from more impervious <br />area than the minimum required. In this case, the development standards would require that runoff <br />from a minimum of 10,000 square feet at the site be treated through a facility or methods specified in <br />the stormwater design manual. Assuming construction of an approved facility which treats runoff <br />from at least 12,000 square feet of the site’s impervious area (meeting the credit criteria of 20% <br />additional area over the minimum required), the development would qualify for a 10% reduction of <br />the stormwater SDC related to the 10,000 square feet of added impervious area. Using current SDC <br />rates of $0.165 per square foot, this development would normally be charged $1,650.00 stormwater <br />SDC but would qualify for a 10% or $165.00 reduction, resulting in a net SDC of $1,485.00. <br />3) Sites where all of the site impervious area is subject to the standards for stormwater pollution <br />reduction which use impervious area treatment reduction techniques to manage runoff from a <br />minimum of 20% of the total impervious area of the development site may qualify. An example of <br />this type of development is a medium-sized single family residence being constructed on a site subject <br />to the standards and which implements an approved impervious area runoff reduction facility, such as <br />an eco roof & roof garden. Assuming the area treated by the eco roof & roof garden is at least 20% <br />of the gross impervious area at the site, this residence would qualify for a 10% reduction if the normal <br />stormwater SDC for a typical residence. Using current SDC rates of $478.50 per medium sized <br />single family residence this development would qualify for a 10% or $47.85 reduction, resulting in a <br />net SDC of $430.65. <br />Development meeting minimum requirements and qualifying for a credit. <br />As illustrated in the examples above, most development types must exceed minimum requirements of <br />stormwater development standards to qualify for an SDC credit. In addition, development subject to <br />stormwater development standards which uses treatment impervious area reduction techniques in <br />order to meet minimum requirements may also qualify for a reduction. Numerous options are <br />available for development to meet minimum requirements of the stormwater development standards; a <br />credit is proposed only for those using impervious treatment area reduction methods to meet or <br />exceed minimum requirements. This is intended to encourage impervious area reduction methods <br />which provide effective methods of pollution reduction by directly reducing the amount of gross <br />impervious area from which runoff must be separately or additionally treated. <br />Monitoring and enforcement program related to on-going requirements for private facility <br />maintenance. <br />An element of the implementation of stormwater development standards for pollution reduction <br />facilities is implementation of a private facility maintenance monitoring and enforcement program. <br />This program is necessary to ensure that the pollution reduction achievements related to construction <br />April 4, 2006 Memo page 2 <br /> <br />