Laserfiche WebLink
<br />The following additional points will clarify the scope of this analysis: <br /> <br />1. This analysis addresses amendments which directly affect Site HG (the Hyundai <br />site). <br /> <br />2. This analysis only considers impacts to the local inventory of buildable land <br />resulting from these amendments to the West Eugene Wetlands Plan. It does not <br />take into consideration changes resulting from other local plans, policies, or <br />actions. <br /> <br />3. The Metropolitan Industrial Lands Inventory Report (July 1993) identifies a <br />projected demand for industrial land in a range from 650 acres to 1,172 acres. <br />This projected demand was not broken down into any sub-categories, such as size, <br />type or location. As a result the analysis here does not address these sub- <br />categories. <br /> <br />4. The Metropolitan Industrial Lands Inventory Report (July 1993) includes land <br />inside the adopted urban growth boundary, which encompasses land both inside <br />and outside the Eugene city limits. Urban services are available to all properties <br />within the city limits, but are not immediately available to properties outside the <br />city limits. These properties outside the city limits must annex to the City of <br />Eugene in order to receive urban services. Consequently, if land outside the city <br />limits is removed from the buildable lands inventory, it has a less immediate <br />effect because these properties are not developable until they are annexed. All of <br />the land included in these amendments are within the Eugene City Limits. <br /> <br />5. All areas designated by these amendments for protection and restoration are <br />vacant, undeveloped areas. Therefore, these amendments will not apply to <br />existing development, and do not apply new land use restrictions to existing <br />development. The wetlands designations included in these amendments affect an <br />undeveloped portion of three partially developed parcels, as shown in the table <br />below: <br /> <br />Site Name Map Number Lot Number New Designation Acreage <br />HG 18-04-04-20 400 Develop 2.7 <br />HG 18-04-04-20 1300 Protect 26.9 <br />HG 18-04-04- 20 1300 Utility Corridor 0.2 <br />HG 18-04-04-20 1300 Develop 2.4 <br />HG 18-04-04-20 1300 Restore 0.5 <br /> <br />Hyundai Site Ordinance, Exhibit B (Statewide Planning Goal Findings) <br /> <br />Page 6 <br />