Laserfiche WebLink
Eugene City Hall Master Planning Utility and Maintenance Costs <br /> <br />June 29, 2006 Page 8 <br /> <br />General discussion about maintenance costs associated with the existing City Hall have been dis- <br />cussed with the City of Eugene’s Facility Management Division, followed by a focused review of <br />maintenance budgets for fiscal year 2007. Based on the information collected in these activities, <br />the maintenance cost categories indicated in Table 11, have been developed. <br /> <br />Table 11. Summary of Existing Building Maintenance Costs. <br />Annual <br />Building Major Capital Deferred <br />Operations Maintenance Maintenance Maintenance, <br />Facility Costs, $/SF Costs, $/SF Budget, $/SF 2006 $ [1] Source <br />Eugene City Hall $ 4.56 $2.50 $5.59 $8,800,000+ Glen Svendsen, <br />personal interview <br />and FY07 budgets <br />858 Pearl (PW) $4.41 $2.40 $7.04 -- FY07 budgets <br />Eugene Public Library $8.99 $2.37 $3.35 -- FY07 budgets <br />Atrium Building TBD [3] TBD [3] TBD [3] TBD [3] <br />Eugene Hotel [2] TBD [3] TBD [3] TBD [3] TBD [3] <br />City Prosecutor Office [2] TBD [3] TBD [3] TBD [3] TBD [3] <br />Parcade [2] TBD [3] TBD [3] TBD [3] TBD [3] <br />Average Existing Cost [4] $ 4.48 $2.45 N/A N/A <br />[1] For existing City Hall, this includes deferred maintenance (pre-2004) and “current” deferred maintenance (2004-2006) of $5,000,000. <br />Anticipated emerging maintenance for the next 5 years is projected to increase deferred maintenance to $28,900,000 by 2011. <br />[2] City occupied space in larger building. <br />[3] To be determined; Current WSSS use and cost information is being obtained for these buildings but has not yet been analyzed and <br />converted to a cost index. <br />[4] Based on the average of the Eugene City Hall and 858 Pearl costs. <br /> <br />Similar to the analysis applied utilities cost, ongoing maintenance cost indices or target costs have <br />been projected for each of three construction cases. The expectations for cost reductions were <br />developed and discussed jointly by the design team and Facility Management Division representa- <br />tives, and are based on the team’s mutual experience relating to maintenance of municipal build- <br />ings. Table 12 summarizes the established maintenance cost targets. Table 13 summarizes the <br />results of a weighted average calculation that results in estimated maintenance costs for each of <br />the six options. <br /> <br />Note that Annual Capital Maintenance and Deferred Maintenance are NOT included in the pro- <br />jected life cycle cost associated with ongoing building maintenance. These categories of mainte- <br />nance cost do not, in general, apply to newly constructed or renovated buildings, and are therefore <br />not included in the following cost discussion. They do, however, have special meaning relative to <br />the existing City Hall infrastructure. To the extent that Annual Capital Maintenance and/or Defer- <br />red Maintenance is significant to any option, consideration of the cost impact can be based on <br />costs presented in Table 11 above, and more detailed discussion with City Staff outside the scope <br />and context of this document. <br /> <br />Table 12. Maintenance Cost Targets for Three Construction Cases. <br />Building Major <br />Operations Maintenance <br />Construction Case Cost, $/SF Costs, $/SF Notes <br />New construction, maximum Assume 10% reduction of average cost for <br />$4.03 $2.20 <br />flexibility to integrate sustainability City Hall and 858 Pearl. <br />New construction, with some limits Assume 7.5% reduction of average cost for <br />$4.15 $2.26 <br />to design and flexibility City Hall and 858 Pearl. <br />Major renovation of existing City Assume 5% reduction of average cost for City <br />$4.26 $2.33 <br />Hall Hall and 858 Pearl. <br />