Laserfiche WebLink
2.4.2.5. Circuits feeding from distribution panels (feeders), size of <br />wire for each feeder circuit, size and number of wires in each conduit, and <br />the load of each circuit. <br />2.4.2.6. Location of fixed electrical equipment loads, with wattage <br />or horsepower. <br />2.4.2.7. Location of individual controls, switches, and similar <br />information. <br />2.4.3. Plumbing Plans. Every person making application for a plumbing <br />permit on any structure, other than Group R, Division 3 (one- and two-family <br />dwellings) and M occupancies (accessory buildings thereto), shall file with the <br />Building Official proper plumbing, water, sewage plans and schedules as may be <br />necessary to determine whether the installation as described will conform to the <br />requirements of the plumbing code. When located outside a manufactured dwelling <br />park, proof shall be provided that provision for rainwater drainage is in accordance <br />with the state one- and two-family dwelling specialty code. The plans submitted <br />must be complete and shall show, among other details, the following: <br />2.4.3.1. Layout for each floor with dimensions showing all <br />rooms and work areas, including a legend of all symbols used. <br />2.4.3.2. Location of all plumbing fixtures within the structure <br />including hose bibs and backflow devices. <br />2.4.3.3. Location and size of all waste and vent piping. <br />2.4.3.4. On a plot plan, location and size of sanitary sewer <br />service or private sewage disposal. <br />2.4.3.5. On a plot plan, location and size of water service or <br />drinking water wells. <br />2.4.3.6. On a plot plan, direction of storm drainage, including <br />location of storm sewers and dry wells. <br />2.4.4. Mechanical Plans. Every person making application for a <br />mechanical permit on any structure, other than Group R, Division 3 (one- and <br />two-family dwellings) and M occupancies (accessory buildings thereto), shall file <br />with the Building Official proper heating and mechanical plans and schedules as <br />may be necessary to determine whether the installation as described will conform <br />to the requirements of the mechanical code and gas piping regulations of the fire <br />code. The plans submitted must be complete and shall show, among other details, <br />the following: <br />Administrative Order - Page 15 of 40 <br />