<br />rl16 <br /> <br />e <br /> <br />AFTER A DISCUSSION OF ITEM 6, PLANS FOR THE SEWAGE DISPOSAL PLANT, BY MR. RALPH RODERICK, <br />OF THE CONSULTING ENGINEERING FIRM or CORNELL, HOWLAND, HAYES AND-MERRYFIELD, IT WAS MOVED BY <br />ALLEN, SECONDED BY GODLOVE THAT THE PLANS AND SPECIFICATIONS BE APPROVED AND ACCEPTED AND THAT <br />THE CITY MANAGER BE AUTHORIZED TO CALL FOR BIDS AS SCHEDULED AND ALSO FOR BI,DS ON AN ADDITIONAL <br />500 FEET OF 72-INCH CONCRETE PIPE. MOTION ~ARRIED. <br /> <br />REPORTS' OF COMMITTEES <br /> <br />'" <br /> <br />A REPORT OF THE PUBLIC WORKS & FINANCE COMMITTEES - RE: CONTRACT AWARDS; PAVING PROJECTS; <br />SUNNY HOLLOW 'ANNEXATI.ON;. ONE-WAY TRAFFI C ACROSS SP TRACKS AT 6TH; FERRY STREET OVERCROSSI NG <br />HANDL1NG OF TWO' WAY TRAFFIC; TRAFFIC SURVEY ON CAMPUS; AND RIGHT OF WAY FOR PORT~AND STREET <br />WAS SUBMITTED AND READ ~S FOLLOWS: <br /> <br />"A MEETI NG OF THE PUBLI C WORKS AND FI NANCE COMMI TTEES WAS HELD. ON MAY 2,2, 1952 WI TH <br />THE ,FOLLOWI NG PRESENT: MAYOR JOHNSON; COUNCILMEN CR8MBAKER, BOOTH, GODLOVE, KOPPE AND <br />SIEGENTHALER; C1TY MANAGER' AND CITY ENGINEER. <br /> <br />I. THE BID OPENING, FOR EIGHT 'IMPROVEMENT PROJECTS WAS REVIEWED AND' THE COMMITTEE, CON- <br />CURRED WITH THE CITY MANAGER AND RECOMMENDED THAT THE PROJECTS BE AWARDED TO THE LOW <br />BIDDERS AS OUTLINED HEREWITH. <br /> <br />CHAMBERS STREET FROM 8TH TO 11TH AVENUE - ACME CONSTRUCTION COMPANY IN AMOUNT OF $13,482.00- <br />$6.60 P,ER FOOT rOR 36 FOOT STREET - 2i" ASPHALTIC CONCRETE PAVING. <br /> <br />UNIVERSITY STREET FROM 28TH AVENUE TO 29TH PLACE - ACME CONSTRUCTION COMPANY IN AMOUNT <br />OF $9,568.10 - $6.40.PER FOOT rOR 34 FOOT STREET OF 3i" ASPHALTIC CONCRETE PAVING. <br /> <br />,WEST BROADWAY FROM GRANT TO GARFIELD STREET - ACME CONSTRUCTION COMPANY IN AMOUNT OF <br />$6,928.70 AT $6.20 PER FOOT FOR 36 FOOT STREET OF 3i" ASPHALTIC CONCRETE PAVING. <br /> <br />24TH AVENUE FROM WASHINGTON TO JEFFERSON S~REET - ACME CONSTRUCTION COMPANY IN AMOUNT OF <br />$3,728.30 AT $6.60 PER FOOT FOR 34 rOOT STREET OF ~i" ASPHALTIC CONCRETE PAVING. <br /> <br />29TH. AVENUE FROM WILLAMETTE STREET TO EAST LINE OF PARKDALE ADDITION - WESTERN CONSTRUCTION <br />COMPANY IN AMOUNT OF $32,778.95 rOR 42 FOOT STREET AT $1 I ."'5'PER FOOT OF CONCRETE PAVING <br />AND SIDEWALKS. TH1S IS $1.15 MORE PER FOOT THAN TH~ B1D FOR ASPHALTIC CONCRETE. <br /> <br />33RD AVENUE FROM DONALD STREET TO CLIFFORD STREET - ACME CONSTRUCTION COMPANY IN AMOUNT <br />OF $15,413.70 AT $6.20 PER rOOT FOR 36 FOOT STREET OF 3i"- ASPHALTIC CONCRETE PAVING. <br /> <br />EMERALD STREET FROM, 26TH: AVENUE TO 28TH AVENUE - ACME CONSTRUCTION COMPANY IN AMOUNT OF <br />$1 1,507.00 AT $5.20 PER FOOT FOR 27 FOOT STREET OF 3i" ASPHALTIC CONCRETE PAVI NG. <br /> <br />STORM SEWER ON 33RD AVENUE FROM DONALD TO CLIFFORD STREET - COAST CaNST. CO. AND JESKE <br />BROS. IN AMOUNT OF $6,5"'9.75 AT $7.00 PER FOOT - 30" AND 36". <br /> <br />2. THE COMMITTEE REVIEWED THE EXISTING CURBS ON 17TH AND 18TH AVENUES EAST. THERE ARE <br />361 FEET OF EXISTING CURBS ON 18TH AVENUE AND 393 FEET OF EXISTING CURBS ON 17TH AVENUE <br />EAST, ALL OF WHICH HAVE BEEN INSTALLED ACCORDI~G TO CITY ALIGNMENT AND GRADES PREVIOUS TO <br />THE ADOPTION OF THE CROSS TOWN STREET PROGRAM. IT WAS RECOMMENDED" BY THE COMMITTEE THAT <br />CREDIT FOR THE INSTALLATION OF THESE PREVIOUS CURBS BE GIVEN TO THE PROPERTY OWNERS IF <br />THESE CURBS HAD TO BE MOVED IN,CONNECTION WITH THE WIDENING OF EAST 17TH AND EAST 18TH <br />AVENUE UNDER THE PRESENT IMPROVEMENT PROGRAM. <br /> <br />3. THE COMMITTEE AGAIN REVIEWED THE PAVING OF EAST 18TH <br />STREET AND RECOMMENDED THAT THE COUNCIL AUTHORIZE 42 FOOT <br />ENDEAVOR TO AFrORD FUTURE CROSS TOWN TRAFFIC FACILITIES. <br />CHANGE ORDER BE AUTH0RIZED WITH CONTRACTOR FOR ADDITIONAL <br />AS ON CONTRACT.. <br /> <br />AVENUE FROM PEARL TO ALDER <br />PAV I NG THROUGHOUT I N_ AN <br />IT WAS RECOMMENDED THAT A <br />QUANTITIES AT SAME UNIT PRICES <br /> <br />"'. THE. REMONSTRANCE PETITIONS AGAINST SIDEWALK INSTALLATION ON THE WEST SIDE OF HARRIS <br />STREET BETWEEN 25TH AND 26TH AND 28TH AND 29TH AVENUES WAS AGAIN REVIEWED~ INASMUCH AS <br />THE OVER-ALL MAJORITY or THE PEOPLE LIVING BETWEEN 25TH AND 29TH AVENUE TOTALING 53.7% <br />HAVE PETITIONED FOR THESE SIDEWALKS AND DUE TO THE FACT THAT THEY WOULD PROVIDE INCREASED <br />SAFETY FOR CHILDREN AND PEDESTRIANS IN THIS AREA, AND PARTICULARLY THOSE GOING TO THE <br />HARRIS STREET SCHOOL, IT WAS RECOMMENDED THAT THE COUNCIL AUTHORIZE THAT THIS PROJECT GO <br />AHEAD. THE IMPROVEMENT ORDINANCES HAVE ALREADy BEEN PASSED. <br /> <br />5. 'THE PAVEMENT OF MADISON STREET.FROM 18TH AVENUE TO 21ST AVENUE WAS REVIEWED AND THE <br />COMMITTEE RECOMMENDED THAT THIS PROJECT BE WITHHELD UNTIL THE ACTUAL PERCENTAGE OF THOSE <br />PROTESTING THE IMPROVEMENT tOULD aE ASCERTAINED. IT WAS ALSO SUGGESTED TH~T ADDITIONAL <br />WRITTEN REQUESTS BE MADE BY THOSE DESIRING THE IMPROVEMENT TO ASSIST IN THE STUDY OF <br />AUTHbRIZING THE IMPROVEMENT O~ THIS STREET. <br /> <br />~ <br /> <br />1 <br /> <br />e <br /> <br />I <br /> <br />I <br /> <br /> <br />II <br /> <br />I <br />I <br />I <br />I <br />II <br />,I <br />II <br /> <br />Ii <br />II <br />Ii <br />", <br />'I <br />I <br />1\ <br />II <br />Ii <br />II <br />I, <br />I <br /> <br />:. <br />J <br /> <br />1 <br /> <br />e <br /> <br />I <br />~ <br /> <br />I <br />II <br /> <br />, <br /> <br />e <br />