My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance No. 20585
COE
>
City of Eugene
>
Ordinances
>
2017 No. 20572 - 20587
>
Ordinance No. 20585 w/Exhibits
>
Ordinance No. 20585
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2017 9:05:08 AM
Creation date
11/15/2017 8:57:17 AM
Metadata
Fields
Template:
Council Ordinances
CMO_Document_Number
20585
Document_Title
Ordinance Establishing the Sufficiency of the Urban Growth Boundary for Residential Land
Adopted_Date
7/17/2017
Approved Date
7/24/2017
Signer
Piercy
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
319
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• A one acre MDR site developed with apartments and associated <br />parking and landscaped open space, which still has a remaining <br />buildable area. <br />City staff and the TRG explored several possible methodologies for <br />identifying the capacity of partially vacant land. For the same reasons <br />explained above, staff and the TRG used the same three methods <br />described in section 4.1.1, Capacity Method 1, Capacity Method 2, and <br />Capacity Method 3. <br />As discussed in section 4.1.1, with one exception, the City applied the <br />three capacity methods to the same land categories in section 4.1.1 <br />regardless of whether the land is vacant or partially vacant. The only <br />difference in the way the City applied the three capacity methods to <br />partially vacant land is that, for partially vacant LDR land, Capacity <br />Method 3 was used (instead of Capacity Method 2) for lots above 900' in <br />elevation, above 5% slope and of 1-5 acres. The reason for this difference is <br />explained under the Capacity Method 3 analysis, below. <br />Capacity Method 1 and Capacity Method 2 require an estimate of the <br />number of partially vacant land acres from the BLI. The BLI estimates of <br />partially vacant land include entire sites, including the portions of the <br />sites that are already developed. To determine the capacity of partially <br />vacant land, the BLI acreage totals were adjusted, with a deduction for <br />existing development on each site. A review of development on the <br />partially vacant LDR lots identified a reasonable deduction for existing <br />houses or structures on the lot as .33 ac on lots less than five percent slope, <br />and .5 ac on lots with slopes of five percent or greater. Review of existing <br />development on the MDR and HDR partially vacant lots identified a <br />reasonable deduction for existing structures, parking, and open space on <br />the lot as either .25 acre, .5 acre, or the approximate amount of the actual <br />existing development if the existing development is over 1 acre. These <br />adjusted acreage totals are reflected in the tables, below. <br />Part 11 — Eugene Housing Needs Analysis ECONorthwest Page 135 <br />
The URL can be used to link to this page
Your browser does not support the video tag.