~sr E~NE PARKWAY ~OD~FIED PROJECT~NSISTEN~ V~TH THE STATE'V~ PLANNING GOALS AND TRANSPORTATION PL~J~N!NG RULE <br /> <br />to place the three interchanges needed and still meet the design requirements of the project. Under <br />OAR 660-012-0065(5~a), jurisdictions need not consider alternatives that are inconsistent with <br />applicable standards or not approved by a registered professional engineer. <br /> <br />Moreover, any design that would remotely approach meeting the geometric design requirement would <br />displace substantial property associated with the West Lawn Memorial Park cemetery and/or the Lane <br />Memorial Gardens cemete~, and displace commercial and industrial prope~ies in the vicinity of <br />Ter~ Street and Beltline Highway near West 1 lth Avenue. <br /> <br />Green Hill Road At-Grade A~ternalive <br />The Green Hill Road At-Grade Alternative would extend the Modified Project westward to Green <br />Hill Road, where it would terminate with an intersectiom A sweeping curve to connect the Green Hill <br />Road and We~ t tth Avenue leg of the alternative would extend west to the project terminus. Double <br />lefts and double rights would be required at each of the intersections of Green Hill Road with West <br />1 lth Avenue and the WEP. <br /> <br />This alternative cannot reasonably accommodate the identified transportation need primarily for two <br />reasons. First, the alternative would impact sensitive species and wet prairie wetlands south of the <br />railroad. Second, from an engineering standpoint, the alignment would be unsafe and is not <br />recommended. This alternative would create conditions likely to result in a high accident location at <br />the intersection of the WEP with Green Hilt Road. Drivers traveling east to ,,vest would encounter <br />condkions where traffic moving at high speeds along a limited access facility first must nearly come <br />to a stop in order to negotiate the cu~e from the WEP onto Green Hill Road, and then immediately <br />cross a railroad crossing. The likelihood is high that this desi~ would result in a high percentage of <br />violent crashes resulting in debilitating injuries or death. Traffic volumes across the railroad track <br />would increase to an excess of 26,000 daily crossings, increasing the number of train/auto conflicts <br />significantly. The proximity of the intersection of the ~P at Green Hill Road to the railroad crossing <br />also conflicts with railroad safety standards. <br /> <br />For these reasons, the Green Hill Road At-Grade Alternative is operationally infe~ible and <br />enviromentally unreasonable and therefore cannot reasonably accommodate the identified need~ <br /> <br />Southern and Southern {~odified) Alternatives <br />The Southern Almrnative would follow the Modified Project alignment to Danebo Avenue, then shift <br />the alignment sonthward through the Green Hill Technology Park and other parcels identified in the <br />~SE[F? as developable industrial lands before reconnecting to West 11th Avenue east of Green Hill <br />Road. <br /> <br />The Southern (Modified) Alternative would be located somewhat to the north of the Southern <br />Alternative, and connect to West 1 lth Avenue slightly to the west of the Southern Alternative <br />although still east of Green Hill Road. Compared m the Southern Alternative, the Southern <br />(Modified) has greater adverse impacts on wetlands and threatened and endangered plants, but would <br />provide a largerbuffer dismce from a plant, Kincaid's Lupine, that serves as a host to the federally <br />proposed endangered Fender's blue butterfly. <br /> <br />While both the Southern Alternative and Southern (Modified) Alternative would function from a <br />design and engineering standpoint, neither is a reasonable alternative because of their impacts to <br />threatened and endangered species; their significant impacts to developing industrial lands in a <br />manner inconsistent with acknowledged ~mprehensive plans, the WEWP and reasonable invesm~ent- <br />backed ns; their damage to the integrity of the compromises realized in the WEV/P; and <br />their overall costs. These impacts are addressed in detail in the Alternatives Memorw~dum, <br />incorporated herein by reference. <br /> <br />EXHiBiT C-i - FINDINGS 37 <br /> <br /> <br />