My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet 7-15-19 Work Session
COE
>
City of Eugene
>
Public Meetings
>
City Council
>
2019
>
07-15-19
>
Agenda Packet 7-15-19 Work Session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2019 4:50:41 PM
Creation date
7/5/2019 4:41:31 PM
Metadata
Fields
Template:
City_Council
City_Council_Document_Type
Agenda Packet
City_Council_Meeting_Type
Work Session
City_Council_Meeting_Date
7/15/2019
City_Council_Effective_Date
7/15/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />May 2019 Investment Package Alternatives MovingAhead <br />28 Supplemental Refinement Report <br />Table 2.13 Examples Community Proposed Build-a-Packages Tabulated Level of Investment <br />Hwy 99 River <br />Road <br />30th Ave <br />– LCC <br />Coburg <br />Road <br />MLK, Jr <br />Blvd <br />No- <br />Build = <br />1 <br />Enhanced <br />Corridor = 3 EmX = 5 Invest <br />Total <br />Examples of Investment Packages Proposed by Community <br />No-Build No-Build No-Build No-Build No-Build 5 0 0 5 <br />Enhanced <br />Corridor No-Build No-Build No-Build No-Build 4 3 0 7 <br />No-Build Enhanced <br />Corridor No-Build Enhanced <br />Corridor No-Build 3 6 0 9 <br />Enhanced <br />Corridor <br />Enhanced <br />Corridor No-Build Enhanced <br />Corridor No-Build 2 9 0 11 <br />EmX EmX Enhanced <br />Corridor No-Build No-Build 2 3 10 15 <br />Enhanced <br />Corridor EmX EmX Enhanced <br />Corridor No-Build 1 6 10 17 <br />Enhanced <br />Corridor EmX Enhanced <br />Corridor EmX Enhanced <br />Corridor 0 9 10 19 <br />EmX EmX Enhanced <br />Corridor EmX Enhanced <br />Corridor 0 6 15 21 <br />Original Proposed Investment Packages <br />Enhanced <br />Corridor <br />Enhanced <br />Corridor <br />Enhanced <br />Corridor <br />Enhanced <br />Corridor <br />Enhanced <br />Corridor 0 15 0 15 <br />Enhanced <br />Corridor EmX No-Build No-Build No-Build 3 3 5 11 <br />Enhanced <br />Corridor EmX No-Build Enhanced <br />Corridor <br />Enhanced <br />Corridor 1 9 5 15 <br />Enhanced <br />Corridor EmX Enhanced <br />Corridor <br />Enhanced <br />Corridor <br />Enhanced <br />Corridor 0 12 5 17 <br />EmX EmX EmX EmX Enhanced <br />Corridor 0 3 20 23 <br />Source: JLA, 2019. <br /> <br />The resulting total levels of investment for the packages (both the original proposed packages and those <br />built by community members) ranged from 5 to 23. These levels of investment were grouped as follows: <br /> <br />Low Level of <br />Investment <br />Low – Moderate <br />Level of Investment <br />Moderate Level of <br />Investment <br />Moderate – High Level <br />of Investment <br />High Level of <br />Investment <br />5-7 9-11 13-15 17-19 21-23 <br /> <br />Using this method of tabulating level of investment, the technical team was able to better gauge the <br />level of investment that participants were interested in and correlate participants’ most important <br />criteria and comments with a package of investments. Of the 249 participants who built a package, 31 <br />percent built a package in the 17-19 range of investment level and 28 percent built a package in the 21- <br />July 15, 2019, Joint Work Session – Item1
The URL can be used to link to this page
Your browser does not support the video tag.