My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet 7-15-19 Work Session
COE
>
City of Eugene
>
Public Meetings
>
City Council
>
2019
>
07-15-19
>
Agenda Packet 7-15-19 Work Session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2019 4:50:41 PM
Creation date
7/5/2019 4:41:31 PM
Metadata
Fields
Template:
City_Council
City_Council_Document_Type
Agenda Packet
City_Council_Meeting_Type
Work Session
City_Council_Meeting_Date
7/15/2019
City_Council_Effective_Date
7/15/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />May 2019 Investment Package Alternatives MovingAhead <br />34 Supplemental Refinement Report <br />• The order of capital costs remained the same with Modified Package A having the lowest capital <br />cost followed by the Enhanced Corridor Package, Packages B and C, and the EmX Package with <br />the highest capital cost <br />• Capital costs improved for one modified package and worsened for two modified packages: <br />o Modified Package A dropped from $119M (Original Package) to $106M (Modified Package) <br />o Modified Package B increased from $181M to $210M <br />o Modified Package C increased from $202M to $274M <br />• Consistency with local plans and policies improved for all three modified packages <br />• Investment in corridors with a higher level of low income and minority populations <br />o Significantly worsened for the Modified Package A (dropping from 98% for the Original <br />Package to 59% for the Modified Package), <br />o Slightly improved for Modified Package B (increasing from 76% to 79%), and <br />o Worsened for Modified Package C (decreasing from 68% to 50%) <br />• The number and acreage of acquisitions worsened for all three modified packages with <br />o Modified Package A increasing from 84/3.5 ac to 96/3.6 ac, <br />o Modified Package B increasing acquired acreage over fewer parcels (from 137/4.6 ac to <br />131/4.9 ac), and <br />o Modified Package C (from 150/5.0 ac to 176/8.0 ac) <br />• The systemwide operating cost change from No-Build improved for one modified package and <br />worsened for two modified packages: <br />o Modified Package A decreased from $1.9M to -$0.7M <br />o Modified Package B increased from $3.0M to $5.9M <br />o Modified Package C increased from $2.5M to $4.3M <br />• Parking impacts worsened for all three modified packages: <br />o Modified Package A increased from 81 to 119 spaces <br />o Modified Package B increased from 148 to 151 spaces <br />o Modified Package C increased from 217 to 285 spaces <br />• Potential property displacements improved slightly for Modified Packages A and C <br />• As noted above, “Annual Systemwide Increase in Ridership” has not been modeled for any <br />modified package and, therefore, cannot be compared to the original proposed investment <br />packages. After the City and LTD decision makers provide direction on the range of refined <br />investment packages to advance to public hearing, the refined packages will be modeled for <br />annual systemwide ridership. <br />• Supporting corridor development and redevelopment improved for Modified Packages B and C <br />July 15, 2019, Joint Work Session – Item1
The URL can be used to link to this page
Your browser does not support the video tag.