My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 5: Resolution Adopting Amended SDC Methodologies and Rates
COE
>
City of Eugene
>
Council Agendas 2007
>
CC Agenda - 02/20/07 Public Hearing
>
Item 5: Resolution Adopting Amended SDC Methodologies and Rates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 12:53:11 PM
Creation date
2/15/2007 8:30:23 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
2/20/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
182
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />process component are then allocated to capacity parameters based on the- allocation <br />fractions in Table 3. . <br /> <br />The final step in the allocation process is to multiply the costs by capacity parameter by the <br />percent of capacity available by parameter. To determine the available capacity for a <br />parameter, the amount of capacity that is currently being used (or required for existing <br />users) is subtracted from the current rated capacity. H the current capacity requirement ~ <br />equal to or greater than the existing capacity, then there is no available capacity, and none of <br />the costs related to. that paramete"r .is included in the reimbursement fee .cost basis. Table 4 <br />shows existing system available capacity by parameter based on system planning criteria. - <br />The documentation for th~se figures is provided in Appendix C. <br /> <br />FIGURE 2-EXISTING SYSTEM AlLOCATION <br /> <br /> <br /> <br />NO <br /> <br />.' .... .".. 'd'" . _ _. . . _. _ . " ,... _, .....-............--.... <br />. ~ - .. .., . . . . - ... - . ."... ~ : :: ..... <br />. .. . .,." d' _. ., .. .. __. <br />.... , .,. - .. ..... ... .. .q' -, -. ...... <br />._ 0' . .... _.,. ... ...... ... . <br /> <br /> <br />i_I <br /> <br />TABLE 4 <br />. Existing System Available Capacity by Parameter <br /> Average Flow Peak Flow BOD TSS <br />Variable (mgd) (mgd) (Ibs/day) (Ibs/day) <br />Existing capacity 49.0 175 66,000 71,600 <br />Current loading (current capacity required) 43.8 264 54,800 64,700 <br />Available capacity (value) . 5.2 None 11 ,200 6,900 <br />Available capacity (0/0) 10.5% 0% 170/0 9.60/0 <br />Source: 2004 -Facilities. Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.