Laserfiche WebLink
AIRPORT DEVELOPMENT ALTERNATIVES <br />4.5.3.4 Landside Alternatives Evaluation <br />All of the landside alternatives have been developed with the intention of meeting all of the evaluation <br />criteria. Performance scores for each landside alternatives in relation to how they meet the evaluation <br />criteria are shown in Figure 4-18. Each concept achieves goals set forth in Section 4.5.3.1 Key Issues and <br />Items for Consideration, by reducing opportunities for unnecessary bypass traffic along the terminal <br />curb-front, addressing the airport loop road intersection entrance, accommodating commercial vehicle <br />staging, allotting space to meet projected PAL 3 parking demand, and correcting roadway dimensional <br />issues. All landside concepts reduce curb road bypass traffic through alternative access roads which <br />eliminate the need for rental cars and airport parkers to drive past the terminal curb-front. The addition of <br />a cell phone lot helps curb operations by reducing curb dwell times and by giving traffic that would <br />otherwise recirculate across the curbs the chance to wait for free. Each concept addresses the airport loop <br />road entrance by implementing a new road design that eliminates the need for anyone driving to terminal <br />facilities to make a left turn. A variety of locations are demonstrated for staging commercial vehicles <br />e program <br />areas within the airport loop road. <br />FIGURE 4-18 <br />LANDSIDE ALTERNATIVES EVALUATION MATRIX <br /> <br />Source: RS&H Analysis, 2017 <br />. Some benefits of this <br />concept are the retention/expansion of parking program areas as they exist at the time of this study. <br />Douglas Drive (terminal loop road) is expanded using portions of Lockheed Drive to allow growth of <br />parking areas adjacent to their existing footprints and within the loop road. The gated tenant parking area <br />is preserved until such a time that terminal development requires the land but employee parking as a <br />EUGENE AIRPORT MASTER PLAN 4-46 <br /> <br />