IMPLEMENTATION AND FINANCING PLAN <br />Project Title: <br />Reconstruct Terminal Taxiways: Phase II - Construction <br />Project Description: <br />Construct new Taxiway Connectors 2 and 3. Reconstruct terminal area airfield taxiways to meet FAA airfield design standards. <br />Construct one (1) heavy pad in terminal apron area near Taxiway A and Taxiway F intersection to serve as hold position and <br />RON parking. Construct three (3) heavy pads suitable for parking a variety of large aircraft (ADG III-VI) north of Concourse A <br />and reconstruct taxiway around the new pads. <br />Project Trigger: <br />Needed as soon as practical to improve safety and meet FAA AC 150/5300-13A standards. Existing conditions already surpass <br />facility requirements recommendations and demonstrate a need for four (4) total RON parking positions. <br />Project Justification: <br />Taxiways A4, A5, and A6 do not meet FAA design standards and present risks to the safe and efficient movement of aircraft on <br />the ground. A Surface Movement Guidance and Control System (SMCGS) route from the terminal to the main runway ends <br />improves safe pilot ground movements by providing situational awareness during low visibility conditions and inclement <br />weather. Current North Ramp heavy pads are not designed to adequately accommodate the critical design aircraft. Four (4) <br />heavy pads would serve as RON parking positions and staging locations during peak traffic while terminal facilities are <br />upgraded to allow concourse gate parking. It is recommended that FAA Voluntary Airport Low Emissions (VALE) Program <br />funding be pursued to finance electrical upgrades which eliminate the need for Ground Power Units (GPUs). <br />Project Schedule: <br />Procurement StartDesign StartConstruction StartConstruction End <br />2018 - Q42019 - Q12020 - Q12020 - Q4 <br />Budgeted Costs: <br />Planning/EnvironmentalA&E DesignConstructionProject Management <br />$335,600$1,678,000$16,780,000$1,342,400 <br />Equipment/Miscellaneous Budgeted Project Cost (2017 $)Budgeted Project Cost (Escalated) <br />$0$20,136,000$21,647,000 <br />Project Location: <br /> <br /> <br />EUGENE AIRPORT MASTER PLAN 5-44 <br /> <br />