My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord. 20640
COE
>
City of Eugene
>
Ordinances
>
2020 No. 20625 - 20644
>
Ord. 20640
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2020 11:45:35 AM
Creation date
10/22/2020 11:43:40 AM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Ordinances
Document_Date
10/12/2020
Document_Number
20640
CMO_Effective_Date
11/20/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
669
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AIRPORT LAYOUT PLAN <br />developed in accordance with ARP SOP 3.00 . <br />Information on each of the existing 54 parcels at EUG include: <br />» Grantor (Selling Owner) <br />» Type of interest acquired <br />» Acreage <br />» Type of conveyance instrument <br />» Liber/book and page of recording <br />» Federal Agreement (FAA Grant Number/PFC Project Number) <br />» Type of Easement <br />» Purpose of Acquisition <br /> <br />The Property Map, established in <br />2006. Since the previous Exhibi was developed, the FAA has updated the requirements for a <br />a complaint <br />e planning team worked <br />with the Airport to find warranty deeds for each of the 54 parcels the Airport is in possession of. During <br />this process, nine of the 54 warranty deeds were unable to be located. Figure 6-1 shows the previous <br /> and a red hatching depicts those parcels of which a warranty deed was not obtained. <br /> <br />FIGURE 6-1 <br />2006 EUGENE AIRPORT EXHIBIT "A" <br /> <br />Source: City of Eugene, 2006 <br /> <br /> EUGENE AIRPORT MASTER PLAN 6-9 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.