My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance No. 19888
COE
>
City of Eugene
>
Ordinances
>
1990s No. 19660-20183
>
Ordinance No. 19888
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 3:47:29 PM
Creation date
11/18/2008 2:16:38 PM
Metadata
Fields
Template:
Council Ordinances
CMO_Document_Number
19888
Document_Title
An ordinance amending the Eugene-Springfield Metropolitan Area Public Facilities Plan (PFP).
Adopted_Date
11/9/1992
Approved Date
11/9/1992
CMO_Effective_Date
12/9/1992
Repeal_Date
12/10/2001
Signer
Jeffrey R. Miller
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TransPlan, which include the following: A--Improves Access, S--Safety, T••Truck <br />Traffic, O--Operational, ED--Economic Development, LOS--Level of Service, and U-- <br />improve to Urban Standards. <br />7~ Street and Highway projects 1, ~, 3, 4, and 5 are needed to increase capacity at <br />intersections to maintain acceptable levels of service. (See descriptions and map <br />attached. <br />8y Street and Highway projects 7,11,12, 13, and 14 are needed to provide #or the future <br />access and circulation needs of areas that are currently undeveloped or <br />underdeveloped, See descriptions and map attached.} <br />9~ Street and Highway projects 8, 9,10, and 15 are needed to bring existing roads up to <br />City standards. See descriptions and map attached. <br />toy Bicycle projects 1 through 8 are needed to provide a complete bicycle network <br />throughout the Refinement Plan area. See descriptions and map attached. <br />Criterion ~: Demonstrated conformance with a licable State statutes. <br />The TransPlan amendments must conform with applicable State statutes. <br />Findings: <br />1 y I~ecause the TransPlan amendments are consistent with the Metro Plan, which is <br />consistent with ORS Chapter 197 has demonstrated inAttachment Al, the amendments <br />are also consistent with ORS 197. No other State statutes apply. <br />Criterion 3: Demonstrated canforrnance with a licable Statewide Plannin Goals and <br />Administrative Rules. <br />The TransPlan amendments must conform with applicable Statewide Planning Goals and Administrative <br />Rules. <br />Findings: <br />1 ~ The Metro Plan has been acknowledged by the Land Conservation and Development <br />Commission as complying with the Statewide Goals and Oregon Administrative Rules. <br />2y The Gateway Refinement Plan is in conformance with the Metro Plan 4see preceding <br />findings, and is therefore in conformance ,with the Statewide Planning Goals and <br />Oregon Administrative Rules. <br />3) The TransPlan amendments implement the Gateway Refinement Plan, and are therefore <br />in conformance with the Statewide Planning Goals and Oregon Administrative Rules. <br />Z <br />
The URL can be used to link to this page
Your browser does not support the video tag.