My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance No. 20002
COE
>
City of Eugene
>
Ordinances
>
1990s No. 19660-20183
>
Ordinance No. 20002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 3:48:18 PM
Creation date
11/21/2008 3:18:58 PM
Metadata
Fields
Template:
Council Ordinances
CMO_Document_Number
20002
Document_Title
Ordinance amending the West Eugene Wetlands Special Area Study adopted by Ordinance No. 19853 on May 20, 1992.
Adopted_Date
3/6/1995
Approved Date
3/6/1995
CMO_Effective_Date
4/6/1995
Signer
Ruth F. Bascom
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit B <br />Eugene City Council <br />Findings and Conclusions <br />In Support of Ordinance # <br />Two sections of the Eugene Code,1971 SEC}have direct bearing on this request. First, EC 9.142 <br />sets forth the guidelines to determine whether the planning commission should initiate a <br />refinement plan amendment. Second, EC 9.145 provides the criteria to determine whether a <br />proposed plan amendment should be approved. The proposed amendments must be consistent <br />with the criteria in EC 9.145 to be appraved. <br />Section 9.142 ~4} The planning commission and council shall consider the fallowin <br />.. ... g <br />guidelines ~n deternumng whether the city should ~utlate an amendment to a refinement <br />plan: ~a} There is an urgent need to consider the amendment in advance of the time it would <br />normally be considered; and <br />Findings: <br />Shelton Turnbull has been planning an expansion since 1992 and had originally planned to be in <br />. g <br />construction m 1994. <br />if a plan amendment for the Shelton Turnbull site is decayed until other amendments to the west <br />Eugene Wetlands Plan ~WEWP} are processed in the summer 1995, the Shelton Turnbull <br />expansion project will be decayed until 1996. <br />The amendment for the Sweetland Industrial Park sites has been contemplated since March 1993. <br />Mr. Sweetland has been unable to sell these two parcels because of the protection status accorded <br />the wetlands in the WEWP. <br />Conclusions: <br />The circumstances surrounding these two sites warrant processing amendments for these sites <br />ahead of the time proposed for a larger set of amendments to the WEWP. Proposed amendments <br />7 and 8 are consistent with this guideline. <br />Section 9.142 ~4} ~} The plan amendment will address one of the following: 1. New or <br />amended policies set forth in a state statute, regulation, planning goal or state agency land <br />use plan; ar <br />Exhibit ~, .Findings and Conclusions --Wage ~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.