Utility Construction and Use of the Right-of-Way Policies and Procedures Manual Page 6 <br />street work will be determined by the Engineering project manager in agreeance with the Surface <br />Technical Supervisor. <br /> <br />2.01.4 Failure to Obtain a Public Way Permit or Comply with Permit Condition <br />Failure to obtain an approved Public Way Permit prior to commencing work in the public way, failing to <br />comply with permit conditions, failing to pay fees or failing to provide required reports within stated <br />timelines may result in any or all of the following: <br /> <br />1. City staff shall collect fees from the responsible party for investigation, review, coordination, <br />inspection, administrative duties, and overhead for any work performed without an approved permit. <br />At a minimum, the permit fee will be double the cost of the original permit fee without any associated <br />joint trench discount. <br />2. Work performed prior to obtaining an approved permit may result in a Stop Work Order being issued <br />to the responsible party to prevent any further work in the public way until an approved permit is <br />obtained and fees are paid in full. Obligation to secure the site before departure is not dismissed. <br />3. Failure to comply with permit conditions may result in a Stop Work Order being issued to the <br />responsible party to prevent any further work until a resolution acceptable to the Utility Coordinator <br />and/or Surface Technical Supervisor is reached. Non-compliance with permit conditions may also <br />result in cancellation of existing permits and/or suspending the processing of future permit applications <br />until a resolution acceptable to the Utility Coordinator and/or Surface Technical Supervisor is reached. <br />Obligation to secure the site before departure is not dismissed. <br />4. Failure to pay required fees may result in cancellation of existing permits and/or suspending the <br />processing of future permit applications until payment is received. <br />2.01.5 Public Way Permit Application and Construction Drawings <br />Public Way Permit applications are available electronically on the City web site at https://www.eugene- <br />or.gov/1091/Permits-and-Right-of-Way-Use, applicant shall be completed by a representative of the Utility <br />or Owner. Completed applications shall be submitted electronically. Permits are only issued to the Utility <br />or Owner, not the installing contractor. <br />Applications for work within the public way shall be accompanied by design drawings of the work <br />described in the application. Drawings deemed incomplete by City staff will be returned to the applicant <br />for completion before City staff will continue review of the application. Drawings shall contain the <br />following elements: <br /> Provider name and contact information, including Scope description. <br /> North arrow and scale. <br /> Vicinity map. <br /> Identification of the work zone (considered to be a minimum of 10 feet around the perimeter of <br />the proposed excavation or facility placement). <br /> Paving and right-of-way widths.