My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance No. 20120
COE
>
City of Eugene
>
Ordinances
>
1990s No. 19660-20183
>
Ordinance No. 20120
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 3:49:13 PM
Creation date
1/14/2009 1:04:45 PM
Metadata
Fields
Template:
Council Ordinances
CMO_Document_Number
20120
Document_Title
Ordinance regarding the method of collecting ad valorem property taxes, and adopting an amendment to the urban renewal plan for the Central Eugene Project.
Adopted_Date
6/1/1998
Approved Date
6/1/1998
CMO_Effective_Date
7/2/1998
Signer
James D. Torrey
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- Strengthen existing retail and seek new retail development for <br />integration into the downtown area. <br />- Support existing and potential office development and other <br />employment-generating uses. <br />- Encourage housing or development which incorporates housin in t <br />g he <br />downtown. <br />Access and Circulation <br />- Improve access and entrances into the downtown from the re ion <br />trans ort g al <br />p at~on system. <br />- Provide better access within the downtown and links es between <br />. g <br />downtown and other mayor act~v~ty centers. <br />- Improve the circulation of traffic within the plan area. <br />- Provide an adequate site and facilities in support of mass transit <br />to meet the present and future needs of downtown employees <br />employers, retailers, businesses, and other downtown users. <br />- Continue to provide access and circulation for bicycles <br />pedestrians, car-pooling, and other alternative modes of <br />transportation. <br />- Assist with the construction of new parking structures to meet <br />existing and future development needs. <br />Public Facilities and Im rovements <br />- Provide outdoor space downtown for ma'or ubiic <br />~ p gatherings. <br />;~. <br />- Provide appropriate landsca in o en s aces res <br />p, gs p p t areas, and other <br />shopper amen ~ t ~ es and convene ences . <br />- Support the development of anew downtown public library. <br />- Construct or reconstruct public improvements that will stimulate <br />nighttime activity or private investment in the downtown area. <br />- Improve the water, steam, sewer, and storm drainage system in the <br />plan area. <br />M <br />Rehabs l i tati an <br />- Encourage repair and rehabilitation of existing buildin s within the <br />ro 'ect area thr g <br />p ~ augh grants and low-interest loan programs. <br />~4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.