Laserfiche WebLink
Prior to the hearing regarding the initiation of the local improvement <br />district on May 29, 1990 property owners who will bear the costs were notified <br />on May 4, well in advance of the minimum 10-days notice stipulated in the <br />code. Additionally, on May 21, a newsletter was sent out to all River Road <br />property owners and residents which provided information on the estimated <br />assessment casts. Four properties were added to the district by their owners <br />signing a waiver of notification rights. The properties were included after <br />staff field investigation determined that providing service with this year's <br />construction was logical and cost effective. These properties and their <br />owners are: <br />17-04-23-4Z-6601 Robert and Carol Dick <br />17-04-23-44-3900 Michael and Leslie Boggs <br />17-04-~3-42-6100 Gale and Maxine Piquet <br />17-04-14-24-4300 Derek Swezey <br />The sanitary sewers are projects constructed under three separate City <br />contracts: 1} Basin A, 90-09; 2} Basin B, 90-10; and 3} Basin C, 90-11. The <br />previously mentioned segment within River Road roadway was under a Lane County <br />contract for the widening of River Road, <br />BASINS A, B, AND C SANITARY SEWERS <br />RIVER ROAD AREA LOCAL IMPROVEMENT DISTRICT PAGE 2 <br />