Laserfiche WebLink
ASSESSMENTS <br />CALCULATIONS <br />The cost to construct the sewers under the three contracts administered by the <br />city for Basins A, B, and C was $4,962,945.46. This is itemized below: <br />1. Payment to contractors totaled $3,716,014.13. <br />2. Professional staff charges of $807,345.00 which includes $784,192.18 <br />of actual charges through December 1990 and an estimate of $22,552.22 <br />of Staff charges from January through completion of the project <br />including the final assessment and as-construct documentation. <br />3. Preconstruction video documentation of properties costs of $21,549.96 <br />4. Aerial Photo development to include aerial s view of the project to <br />include in the drawings for contractors to bid on the project cost <br />$3,271.75. <br />5. Informational signs placed during construction cost $900 <br />6. Geotechnical exploration to determine underground conditions far <br />bidders cost $6,785.40. <br />7. Outside Engineering Consultant work was $11,625 and allowed independ- <br />ent review of the bids, and estimates of the work. <br />8. Field testing to confirm construction was i n accordance with speci f ~ - <br />cations cost $24,169.00. <br />9. The 5/o Administration fee pays for Finance division expenses includ- <br />ing the certified notifications of proposed assessments, information <br />about financing programs and staff time to determine eligibility of <br />individuals for the five deferral programs, process financing <br />BASINS A, B, AND C SANITARY SEWERS <br />RIVER ROAD AREA LOCAL IMPROVEMENT DISTRICT PAGE 3 <br />