My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance No. 19757
COE
>
City of Eugene
>
Ordinances
>
1990s No. 19660-20183
>
Ordinance No. 19757
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 3:46:37 PM
Creation date
1/29/2009 2:11:41 PM
Metadata
Fields
Template:
Council Ordinances
CMO_Document_Number
19757
Document_Title
An ordinance levying assessments for sanitary sewers in the River Road area for Basins "A," "B," and "C"; and declaring an emergency.
Adopted_Date
3/4/1991
Approved Date
3/4/1991
CMO_Effective_Date
3/4/1991
Signer
Jeffrey R. Miller
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ASSESSMENTS <br />CALCULATIONS <br />The cost to construct the sewers under the three contracts administered by the <br />city for Basins A, B, and C was $4,962,945.46. This is itemized below: <br />1. Payment to contractors totaled $3,716,014.13. <br />2. Professional staff charges of $807,345.00 which includes $784,192.18 <br />of actual charges through December 1990 and an estimate of $22,552.22 <br />of Staff charges from January through completion of the project <br />including the final assessment and as-construct documentation. <br />3. Preconstruction video documentation of properties costs of $21,549.96 <br />4. Aerial Photo development to include aerial s view of the project to <br />include in the drawings for contractors to bid on the project cost <br />$3,271.75. <br />5. Informational signs placed during construction cost $900 <br />6. Geotechnical exploration to determine underground conditions far <br />bidders cost $6,785.40. <br />7. Outside Engineering Consultant work was $11,625 and allowed independ- <br />ent review of the bids, and estimates of the work. <br />8. Field testing to confirm construction was i n accordance with speci f ~ - <br />cations cost $24,169.00. <br />9. The 5/o Administration fee pays for Finance division expenses includ- <br />ing the certified notifications of proposed assessments, information <br />about financing programs and staff time to determine eligibility of <br />individuals for the five deferral programs, process financing <br />BASINS A, B, AND C SANITARY SEWERS <br />RIVER ROAD AREA LOCAL IMPROVEMENT DISTRICT PAGE 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.