Laserfiche WebLink
agreements, establish payments, bill final assessments and monitor <br />the payments of the assessments over the course of the bond period. <br />For this assessment, $161,301.39 was included in the assessment <br />calculation . <br />10. Short term financing to pay for project charges mentioned above cost <br />$13s,29s.oo. <br />11. Legal fees to address suits brought against the city relating to the <br />construction project totaled $41,643.50. This litigation affected <br />the sanitary sewer projects to be constructed in all eight basins in <br />the River Road area, Three of these basins are involved in these <br />assessments therefore three-eighths of that cost or $15,616.31 is <br />included in the assessment calculations far this year. Future year <br />assessments in River Road will include the remainder of the charges. <br />12. Additional costs to obtain short-term financing for the 1990 con- <br />struction were $55,463.52. These costs were a result of a Bond <br />Anticipation Note sale which failed due to legal questions raised in <br />a 1 awsui t. The circuit court ruled i n the Ci tys s favor an al 1 issues <br />and no appeal has been taken. <br />The total cost of $4,962,945.46 includes all the above costs. A portion of <br />the total cost includes $610,471.90 of street repair costs which the City an- <br />ticipates will be paid by Lane County and have not been included within the <br />assessment distribution. A segment of the system in basin "A" was greater <br />than eight-inches in diameter; the City will pay the incremental cost over the <br />eight-inch diameter. The remainder of the costs were divided into the lateral <br />BASINS A, B, AND C SANITARY SEWERS <br />RIVER ROAD AREA LOCAL IMPROVEMENT DISTRICT PAGE 4 <br />