My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance No. 19757
COE
>
City of Eugene
>
Ordinances
>
1990s No. 19660-20183
>
Ordinance No. 19757
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 3:46:37 PM
Creation date
1/29/2009 2:11:41 PM
Metadata
Fields
Template:
Council Ordinances
CMO_Document_Number
19757
Document_Title
An ordinance levying assessments for sanitary sewers in the River Road area for Basins "A," "B," and "C"; and declaring an emergency.
Adopted_Date
3/4/1991
Approved Date
3/4/1991
CMO_Effective_Date
3/4/1991
Signer
Jeffrey R. Miller
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
agreements, establish payments, bill final assessments and monitor <br />the payments of the assessments over the course of the bond period. <br />For this assessment, $161,301.39 was included in the assessment <br />calculation . <br />10. Short term financing to pay for project charges mentioned above cost <br />$13s,29s.oo. <br />11. Legal fees to address suits brought against the city relating to the <br />construction project totaled $41,643.50. This litigation affected <br />the sanitary sewer projects to be constructed in all eight basins in <br />the River Road area, Three of these basins are involved in these <br />assessments therefore three-eighths of that cost or $15,616.31 is <br />included in the assessment calculations far this year. Future year <br />assessments in River Road will include the remainder of the charges. <br />12. Additional costs to obtain short-term financing for the 1990 con- <br />struction were $55,463.52. These costs were a result of a Bond <br />Anticipation Note sale which failed due to legal questions raised in <br />a 1 awsui t. The circuit court ruled i n the Ci tys s favor an al 1 issues <br />and no appeal has been taken. <br />The total cost of $4,962,945.46 includes all the above costs. A portion of <br />the total cost includes $610,471.90 of street repair costs which the City an- <br />ticipates will be paid by Lane County and have not been included within the <br />assessment distribution. A segment of the system in basin "A" was greater <br />than eight-inches in diameter; the City will pay the incremental cost over the <br />eight-inch diameter. The remainder of the costs were divided into the lateral <br />BASINS A, B, AND C SANITARY SEWERS <br />RIVER ROAD AREA LOCAL IMPROVEMENT DISTRICT PAGE 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.