Laserfiche WebLink
Project Name: 9th and 10th Secondary Clarifier <br />Description: This project adds two new 130-ft concrete secondary clarifiers. <br /> <br />Justification: The project provides additional secondary treatment and peak flow <br /> management capacity. <br /> <br />Project Driver: This project expands the wet weather base capacity (maximum month and <br /> maximum week conditions). DEQ requirement that the peak wet weather <br /> flow (5-year, 24-hour rain event) be treated by the E/S WPCF by the year <br /> 2010; need to increase the sustained secondary capacity from <br /> approximately 100 mgd to 160 mgd. <br /> <br />Project Trigger: Wet season flows through secondary treatment exceeding 134 mgd. <br />Type of PrOject 100% Capacity <br /> <br />Estimated Project Cost $6,300,000 <br />(2004 Dollars): <br /> <br />Phasing: Budgeted for FY2006/07 <br /> <br />Project Name: Level II Reuse at Seasonal Industrial Waste <br />Description: Provide 1.25 mgd of level II reuse water at the SIW <br />Justification: <br />Project Driver: <br />Project Trigger: <br />Type of Project 100% Performance <br /> <br />Estimated Project Cost $400,000 <br />(2004 Dollars): <br /> <br />Phasing: Budgeted for FY2006/07 <br /> <br /> <br />