My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item A-MWMC Facilities Plan
COE
>
City of Eugene
>
Council Agendas 2004
>
CCAgenda-05/19/04WS
>
Item A-MWMC Facilities Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 1:11:10 PM
Creation date
5/12/2004 3:16:01 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
5/19/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
349
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Name: Local level IV effluent reuse demonstration project <br /> <br />Description: 0.5 to 1.0 mgd of Level 4 reuse water. Install moveable filter, UV system, <br /> piping, and distribution system. Land to be determined. <br /> <br />Justification: Implements Level 4 reuse so that thermal load is removed from the <br /> Willamette River. <br /> <br />Project Driver: Expansion of dry weather effluent reuse programs. Current NPDES <br /> thermal load compliance. <br /> <br />Project Trigger: Potential exceedance of NPDES thermal load limit. Identification of dry <br /> weather water needs for potential clients. <br /> <br />Type of Project 100% Performance <br />Estimated Project Cost $2,100,000 <br />(2004 Dollars): <br /> <br />Phasing: Budgeted for FY2006/07 <br /> <br />Project Name: Reline Lagoons at BMF - Phase 1 <br />Description: Reline lagoons, Phase 1 - from existing MWMC CIP. <br />Justification: Testing has indicated that the lagoons may be leaking. <br />Project Driver: Regulatory requirements and maintaining operational reliability. <br /> <br />Project Trigger: Identification of temporary storage location for contents of lagoon and <br /> installation of temporary equipment required to transfer lagoon contents. <br /> <br />Type of Project 100% Rehabilitation <br />Estimated Project Cost $1,200,000 <br />(2004 Dollars): <br /> <br />Phasing: Budgeted for FY2006/07 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.