My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item A-MWMC Facilities Plan
COE
>
City of Eugene
>
Council Agendas 2004
>
CCAgenda-05/19/04WS
>
Item A-MWMC Facilities Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 1:11:10 PM
Creation date
5/12/2004 3:16:01 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
5/19/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
349
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Name: Headworks Expansion <br /> <br /> Description: Expand headworks so that all of the 2025 wet weather peak flow receives <br /> preliminary treatment. <br /> <br />Justification: New dry weather headworks that will be used in conjunction with the <br /> existing headworks (which will then be used for peak flow events) to <br /> provide preliminary treatment for a total peak wet weather flow of 277 <br /> mgd. <br /> <br /> Project Driver: Increases in peak wet weather flows resulting from the elimination of <br /> sanitary sewer overflows. <br /> <br />Project Trigger: Peak wet weather flows in excess of 210 mgd. <br />Type of Project 100% Capacity <br />Estimated Project Cost $12,800,000 <br />(2004 Dollars): <br /> <br />Phasing: Budgeted for FY2007/08 <br /> <br />Project Name: Primary Sludge Thickening Outside of Clarifiers <br />Description: Thin primary sludge pumping and piping systems to thickeners, {covered <br /> for odor control), supernatant ovedlow pumping and piping, thickened <br /> sludge piping/pumping to digesters. See Odorous Air Treatment for <br /> treatment of odors. <br /> <br />Justification: One of the projects that increases capacity of existing primary clarifiers <br /> from approximately 103 mgd to 165 mgd. <br /> <br />Project Driver: All peak wet weather flows must receive primary treatment prior to <br /> diversion and effluent blending to meet the current NPDES permit for total <br /> suspended solids. <br /> <br />Project Trigger: Primary clarifier surface overflow rates exceeding 1800 gpd/sf: Sustained <br /> wet weather flows through the primaries in excess of 103 mgd after <br /> baffling improvements are made. <br /> <br />Type of Project 100% Capacity <br /> <br />Estimated Project Cost $3,600,000 <br />(2004 Dollars): <br /> <br />Phasing: Budgeted for FY2007/08 <br /> <br /> <br />