My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance No. 19418
COE
>
City of Eugene
>
Ordinances
>
1980s No. 18550-19659
>
Ordinance No. 19418
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2010 3:44:41 PM
Creation date
2/19/2009 12:38:14 PM
Metadata
Fields
Template:
Council Ordinances
CMO_Document_Number
19418
Document_Title
An ordinance adopting the Eugene Entrance Beautification Study.
Adopted_Date
10/27/1986
Approved Date
10/27/1986
CMO_Effective_Date
11/27/1986
Signer
Brian B. Obie
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
This reconstruction project will alsa need to address the existin~ lack of <br />cuff icient ri ht-of - a • • g • <br />g w y along ,Roosevelt Boulevard near tts tntersectton <br />with Highway 99, Currently there is insufficient s ace for even c - <br />. p urb <br />side sidewalks and this heavily-traveled arterial should be improved with <br />. set-back .sidewalks to meet both .pedestrian safety and entrance <br />.beautification objectives , <br />Because funding far the major reconstruction of Highway 99 is not <br />expected to become available before ~99~, serious consideration should be <br />given to short term improvements at four locations along the Highwa 99 <br />corridor as outlined below. T y <br />hese improvements should be designed as <br />permanent improvements which could be retained as part of the future <br />reconstruction of the Highway 99 corridor, enhancing its tale as a major <br />entrance to the city in both the short and long term. <br />~6]a. Intersection of Highway 99 and Roosevelt Boulevard <br />While these proposed improvements...Treatment of the intersection of <br />Roosevelt and Highway 99 would require certain construction measures <br />before 1 andscape p1 anti ngs can be instal 1 ed and sidewalks will be <br />incorporated in the permanent improvements at each carnet of this <br />intersection <br />~l]b, Highway 99 overpass <br />~8]c. Highway 99 and the 5th Avenue Tri angl e <br />~9]d. Highway 99 at 1th Avenue, lth Place and Garf i e1d . <br />N. .Renumber and revise references to remaining material under ether <br />Entrance Beautification Projects Coming From the Airport and Points <br />North, v`n pages I2 and 13 as follows: <br />~ 10 . ]l. River Road and the Future Chambers Connector, ~ Beacon drive to <br />7th Avenue <br />- A major reconstruction and widening of portions of River Road has <br />already been completed by Lane County and further work on this <br />corrtdor is anticipated in the next several years. Lane Coun and <br />. ty <br />Eugene will work with property owners on the design and implementation <br />. of future improvements as part of the River Road widenin and <br />reconstruction. Other im roe g <br />p v ments that recognize this corridor's role <br />as an entrance into Eugene will be implemented in conjunction with <br />landscape and buffering requirements associated with adjacent private <br />development. <br />[11.]S. Railroad Boulevard from River Road to First Avenue River <br />]. <br />Road to Van Buren Street <br />~. Revise the reference to the downtown mall in the last sentence on a e <br />I3, as follows: P g <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.