Laserfiche WebLink
12s. ~ <br />~entenniai Boulevard, Patterson Slough to I«5: <br />provide curb, gutter and sidewai ks <br />-add center turn ~ anes <br />Cost: ~~,Da4,Daa <br />Distance : ~ . 6 rni . <br />Justi f i cati an : A, S, U <br />Jurisdiction: Eug <br />Discussion : This project was apparently 1 eft off the original List due to <br />an oversight . The C.z t y of Eugene plans to construct it in 1989 or .1990 and <br />recommends that it be included zn the Short-Range Phase. <br />152. ~ .. <br />H i lya rd St at ~ 3th ; <br />add east bound through lane <br />remove parking <br />Cost: limited capital cost <br />Distance : , afi mi . <br />Justification; LDS, S <br />Juri sdi cti an : Eug <br />Discussion : The need far this pra ject, which Will reduce air poll utian by <br />improving traffic flow, Was determined through the City of Eugene's <br />Central Area Transportation Study. <br />153.) <br />H i lya rd St, E ~ ~ th to E 13th <br />- remove parking/restri pe as 3 1 anes <br />Cost: limited capita] Bost <br />Distance :.14 mi . <br />Justification : LQS, S <br />Juri sdi cti an: Eug <br />Discussion : The need for this pra ject, which wi11 reduce a.rr pollution by <br />improving traffic flow, was determined through the City of Eugene's <br />Central Area Transportation Study. <br />154.) <br />Pearl/Amazon Parkway, 18th to 4th : <br />widen to provide two southbound lanes <br />Cast: $I85,0~a <br />Distance : 0.4 mi . <br />Justification:LaS,D <br />Jurisdiction; Eug <br />Discussion: The need for this project rags deter~rined through the City of <br />Eugene's Central Area Transportation Study. It is needed to alleviate <br />traffic congestion at the Pearl and 18th intersection. <br />