My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution No. 3716
COE
>
City of Eugene
>
Resolutions
>
pre 1996 Resolutions
>
Resolution No. 3716
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2012 10:33:21 AM
Creation date
1/19/2010 9:54:41 AM
Metadata
Fields
Template:
City Recorder
CMO_Document_Type
Resolutions
Document_Date
9/13/1982
Document_Number
Resolution No. 3716
CMO_Effective_Date
9/13/1982
Author
Karen Soldman
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
37/6 <br />On page 17, revise proposal 1 to read* "[Require] Site review procedures <br />should be requ i red for review . . portion of the node." <br />27. On page 17, revise proposal 2 to read: "[Provide] Adequate automobile <br />access should be re u i red [into] to serve the residential area . avoiding <br />Ein] a through automobile traffic movement within a residential area." <br />28. On page 17, revise proposal 3 to read: "[Provide] Safe and adequate pedes- <br />trian and bicycle access should be Y prov i ded either within the public right-of- <br />way or as an independent easement or route," <br />29. on page 19, revise policy 1 to read: "Highest priority [should] shall be <br />given to preserving housing in the Bethel Triangle area. It [should] sha1T be <br />recognized [for what] that it is an irreplaceable resource . Support for its <br />continued viability [should] shall be provided along . . ." <br />30. On page 19, revise Policy 2 to read: <br />"Any changes in zone within the Bethel Triangle area [should] shall conform to <br />the following guidelines: <br />a. Industrial development [should not occur where it would take access <br />from the same local street which serves existing residential develop- <br />ment in areas where land use proposed in this plan includes retention <br />of existing residential development] within and on the periphery of <br />the Bethel Triangle [must] shall give due consideration to minimizing <br />[development] impact on- residential development." <br />31. on page 20, delete proposal 1b. <br />32. on page 20, revise proposal lc (now proposal lb) to read: "[c] b rezoning <br />of residentially zoned parcels . . . to the east E.],[To] to minimize impact on <br />. west side of Aberdeen Street." <br />33. on pages 22 and 23, revise existing and proposed land use maps for the <br />Bethel Triangle area to reflect commercial land uses between Highway 99 North <br />and the Burlington Northern Railroad <br />34, On page 27, revise policy 1 to read: "The Eugene Parks and Recreation <br />Department [should] shall continue . . . facilities." <br />35. On page 27, revise policy 2 to read: "Private developers [should] shall be <br />encouraged . . . for Parks." <br />36, on page 28, revise policy 3 to read: "Landscape buffer [should] shall be <br />provided . . . etc." <br />37. On page 27, revise policy 5 to read: "A community center or centers <br />[should] shall be . . . whole." <br />38, on page 27, revise policy 6 to read: "Acquisition and development . . <br />[should] shall receive . . . the city," <br />4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.