My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item B: West 11th Transportation Corridor Study
COE
>
City of Eugene
>
Council Agendas 2010
>
CC Agenda - 07/12/10 Work Session
>
Item B: West 11th Transportation Corridor Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2010 11:42:44 AM
Creation date
7/9/2010 10:30:59 AM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
7/12/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Call-Out Project Purpose <br /> <br />R Install southbound bike lane on Garfield St Transition between use of Fern Ridge Path as the <br />ththth <br />between W. 11 Ave and W. 13 Ave (consistent parallel route to W. 11 Ave and the on-street bike <br />thth <br />with RTP project 145) facilities planned for W. 11 Ave and W. 13 Ave. <br />This transition is needed because the Fern Ridge <br />th <br />S Install westbound bike lanes on W. 11 Ave <br />Path begins to head south (near its connection to <br />between Garfield St and Chambers St (tie into W. <br />th <br />13 Ave just east of Arthur St) and no longer is as <br />th <br />11 Ave bike lanes east of Chambers St that were <br />th <br />easily accessible from W. 11 Ave. <br />specified as RTP project 106) <br />th <br />T Install eastbound bike lanes on W. 13 Ave <br />between Garfield St and Chambers St (tie into W. <br />th <br />13 Ave bike lanes east of Chambers St that were <br />specified as RTP project 109) <br /> <br /> <br /> <br />th <br />West 11 Avenue Corridor Study September 4, 2009 <br />City of Eugene P07265-003-000 <br />31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.