Laserfiche WebLink
<br />Call-Out Project Purpose <br /> <br />R Install southbound bike lane on Garfield St Transition between use of Fern Ridge Path as the <br />ththth <br />between W. 11 Ave and W. 13 Ave (consistent parallel route to W. 11 Ave and the on-street bike <br />thth <br />with RTP project 145) facilities planned for W. 11 Ave and W. 13 Ave. <br />This transition is needed because the Fern Ridge <br />th <br />S Install westbound bike lanes on W. 11 Ave <br />Path begins to head south (near its connection to <br />between Garfield St and Chambers St (tie into W. <br />th <br />13 Ave just east of Arthur St) and no longer is as <br />th <br />11 Ave bike lanes east of Chambers St that were <br />th <br />easily accessible from W. 11 Ave. <br />specified as RTP project 106) <br />th <br />T Install eastbound bike lanes on W. 13 Ave <br />between Garfield St and Chambers St (tie into W. <br />th <br />13 Ave bike lanes east of Chambers St that were <br />specified as RTP project 109) <br /> <br /> <br /> <br />th <br />West 11 Avenue Corridor Study September 4, 2009 <br />City of Eugene P07265-003-000 <br />31 <br />