Laserfiche WebLink
Silver Lane from River Road to Grove Street <br />Project Description: This project consisted of repairing Silver Lane from River Road to Grove <br />Street in north Eugene. <br />Treatment Methodology: Silver Lane was in fair condition and pavement testing supported <br />rehabilitating the street with an inlay treatment (see Key Terms, above) with full depth <br />reconstruction at isolated spots where base failures were evident. <br />Costs: Total project costs, from all funding sources, are estimated at $567,000. <br />Total Bond Funds Programmed to the Project = $ 305,000 <br />Total Projected /Actual Bond Funds Used = $ 450,000 <br />Difference = $ - 145,000 <br />In order to remove enough depth of pavement to eliminate reflective cracking from occurring in <br />5 to 7 years, a thicker inlay treatment depth of the pavement was needed than originally <br />anticipated when the street repair bond was developed, which increased the project cost. <br />Additional Sources of Funding: Stormwater and wastewater utility funds, and transportation <br />system development charges. <br />Project Photos: <br />Silver Lane pre- construction Silver Lane post- construction <br />2012 SRRP REPORT <br />