Laserfiche WebLink
Taney Street from Barger Drive to Marshall Avenue <br />Project Description: This project consisted of rehabilitating Taney Street from Barger Drive to <br />Marshall Avenue in north Eugene. <br />Treatment Methodology: Taney Street was in fair condition and pavement testing supported <br />rehabilitating the street with an inlay treatment (see Key Terms, above) with full depth <br />reconstruction at isolated spots where base failures were evident. <br />Costs: Total project costs, from all funding sources, are estimated at $496,000. <br />Total Bond Funds Programmed to the Project = $ 349,000 <br />Total Projected /Actual Bond Funds Used = $ 483,000 <br />Difference = $ - 134,000 <br />In order to remove enough depth of pavement to eliminate reflective cracking from occurring in <br />5 to 7 years, a thicker inlay treatment depth of the pavement was needed than originally <br />anticipated when the street repair bond was developed, which increased the project cost. <br />Additional Sources of Funding: Stormwater and wastewater utility funds, and transportation <br />system development charges. <br />Project Photos: <br />2012 SRRP REPORT <br />Taney Street pre- construction <br />Taney Street post - construction <br />