My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item C: Review of Implementation of Street Bond Measure
COE
>
City of Eugene
>
Council Agendas 2013
>
CC Agenda - 02/20/13 Work Session
>
Item C: Review of Implementation of Street Bond Measure
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2013 9:41:51 AM
Creation date
2/14/2013 3:09:18 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
2/20/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Terry Street from 100 feet north of Avalon Street to Royal Avenue <br />Project Description: This project consisted of rehabilitating Terry Street from 100 feet north of <br />Avalon Street to Royal Avenue in west Eugene. <br />Treatment Methodology: Terry Street had a significant amount of medium severity cracking <br />with some areas of high severity cracking. A mix of partial depth reconstruction and inlay <br />treatment were used to rehabilitate this pavement. <br />Costs: Total project costs, from all funding sources, are estimated at $385,000. <br />Total Bond Funds Programmed to the Project = $ 978,000 <br />Total Projected /Actual Bond Funds Used = $ 374,000 <br />Difference = $ 604,000 <br />When the street repair bond was developed, it was anticipated that this section of Terry Street <br />would need full or partial depth reconstruction. Based on pavement testing, it was determined <br />only the northbound side of the street on the south half of the project needed partial depth <br />reconstruction. The rest of the street only required an inlay treatment, significantly reducing the <br />overall project cost. <br />Additional Sources of Funding: Stormwater and wastewater utility funds, and transportation <br />system development charges. <br />Project Photos: <br />2012 SRRP REPORT <br />Terry Street pre- construction <br />Terry Street post- construction <br />
The URL can be used to link to this page
Your browser does not support the video tag.