Laserfiche WebLink
Warren Street from Bailey Hill Road to Timberline Drive <br />Project Description: This project consisted of rehabilitating Warren Street from Bailey Hill <br />Road to Timberline Drive in southwest Eugene. <br />Treatment Methodology: Warren Street had a significant amount of cracking on the southern <br />end of the project. There were areas with cracking elsewhere along the project, although <br />primarily in the northbound lane. Poor quality gravel base was encountered beneath the asphalt <br />pavement during pavement testing. Based on the pavement testing it was determined that a 5 <br />inch deep inlay treatment was needed, with full depth spot repairs where the pavement and <br />base had failed. <br />Costs: Total project costs, from all funding sources, are estimated at $460,000. <br />Total Bond Funds Programmed to the Project = $ 217,000 <br />Total Projected /Actual Bond Funds Used = $ 452,000 <br />Difference = $ - 235,000 <br />The depth of distressed pavement to be removed with the inlay treatment was deeper than was <br />anticipated and more full depth spot repairs were needed than originally anticipated when the <br />street repair bond was developed increasing the project costs. <br />Additional Sources of Funding: Stormwater utility funds and transportation system <br />development charges. <br />Project Photos: <br />Warren Street pre- construction <br />2012 SRRP REPORT <br />Warren Street post- construction <br />