My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item C: Review of Implementation of Street Bond Measure
COE
>
City of Eugene
>
Council Agendas 2013
>
CC Agenda - 02/20/13 Work Session
>
Item C: Review of Implementation of Street Bond Measure
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2013 9:41:51 AM
Creation date
2/14/2013 3:09:18 PM
Metadata
Fields
Template:
City Council
City_Council_Document_Type
Agenda Item Summary
CMO_Meeting_Date
2/20/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Warren Street from Bailey Hill Road to Timberline Drive <br />Project Description: This project consisted of rehabilitating Warren Street from Bailey Hill <br />Road to Timberline Drive in southwest Eugene. <br />Treatment Methodology: Warren Street had a significant amount of cracking on the southern <br />end of the project. There were areas with cracking elsewhere along the project, although <br />primarily in the northbound lane. Poor quality gravel base was encountered beneath the asphalt <br />pavement during pavement testing. Based on the pavement testing it was determined that a 5 <br />inch deep inlay treatment was needed, with full depth spot repairs where the pavement and <br />base had failed. <br />Costs: Total project costs, from all funding sources, are estimated at $460,000. <br />Total Bond Funds Programmed to the Project = $ 217,000 <br />Total Projected /Actual Bond Funds Used = $ 452,000 <br />Difference = $ - 235,000 <br />The depth of distressed pavement to be removed with the inlay treatment was deeper than was <br />anticipated and more full depth spot repairs were needed than originally anticipated when the <br />street repair bond was developed increasing the project costs. <br />Additional Sources of Funding: Stormwater utility funds and transportation system <br />development charges. <br />Project Photos: <br />Warren Street pre- construction <br />2012 SRRP REPORT <br />Warren Street post- construction <br />
The URL can be used to link to this page
Your browser does not support the video tag.